Above, left: The fitting is prepared for cementing by applying Tangit primer.
Above, right: Using a brush, Tangit solvent cement is applied to pipes and fittings.
Above, left: Side view of the UPVC pipe work, valves and fittings attached to a third party’s fibre reinforced tank.
Above, right: Installation progresses as fittings will soon be attached to these open ends.
Above: An overview of recently installed UPVC pipe work including a range of butterfly valves, tees, elbows.